
CMTS was selected to provide Inspection Services for the installation of new and replacement of existing sewer mains.
The scope of the project consisted of saw cutting, excavation, shoring, removing, and disposing of existing pavement, spoils, sewer pipe, and designated manholes. Additionally, CMTS reviewed schedules, submittals, and design drawings, inspected all equipment and material to be used on the job, supervised street closures, and coordinated with city transportation, sanitation, and all other affected departments.
This work consisted of approximately 2,860 linear feet of sewer main installation and replacement, and 380 linear feet storm drain installation and replacement.
